We offer comprehensive solutions, from design to commissioning.
Our Services
Electrical installation work—installation of electrical equipment and electrical networks at nuclear power plants, thermal power plants, combined heat and power plants, hydroelectric power plants, pumped-storage hydroelectric power plants, and gas turbine units;
– Installation of electrical equipment for substations ranging from 35 to 750 kV;
– Installation of domestic and foreign-made SF6 equipment;
– Installation of electrical equipment for 6–10 kV transformer substations;
– Installation and construction of power transmission cable lines up to and above 110 kV;
– Installation of power and electrical equipment at industrial facilities;
– Electrical installation work for the installation of outdoor and indoor lighting systems;
– Installation of automation, control, protection, alarm, and switching systems;
– Installation of complete busbar and cable systems (generator, main, and distribution);
– Installation of grounding devices and grounding networks.
The commissioning department of Elektropivdenmontazh LLC performs repairs, measurements, testing, diagnostics, and commissioning during the commissioning of electrical equipment in electrical installations
– AC electric motors;
– Power transformers, autotransformers, and reactors up to 35 kV;
– Current and voltage measuring transformers;
– Oil-filled, electromagnetic, vacuum, and SF6 circuit breakers;
– Load break switches;
– Disconnectors, isolators, and short-circuiters;
– Complete indoor and outdoor switchgear assemblies;
– Complete shielded busbars;
– Contact connections for busbars, connecting bars, wires, and lightning protection
cables;
– Dry-type current-limiting reactors;
– Surge arresters;
– Bushings and bushing insulators;
– Suspension and support insulators;
– Relay protection, emergency protection systems, remote control, and
substation signaling based on electromechanical and microprocessor technology, and secondary
connection circuits;
– Electrical wiring and equipment rated up to 1 kV;
– Storage batteries;
– Grounding devices;
– Power cable lines.
We hold a permit from the electrical engineering laboratory to perform high-risk work and
a certificate of conformity for our measurement system with DSTU ISO 10012:2005 standards.
KVP and A
– Installation of impulse line systems using argon arc welding;
– Installation of instrumentation and control devices;
– Installation of instrumentation and control equipment;
– Installation of instrumentation and control test benches.
Fire prevention work
— Installation of fire alarm, fire notification, and evacuation systems;
– Fireproofing work involving the application of fire-resistant materials;
– Fire-resistant filling;